ADNOC – Bu Hasa Integrated Field Development Project
The Bu Hasa Integrated Field Development Project is a strategic initiative by Abu Dhabi National Oil Company (ADNOC) aimed at increasing crude oil production capacity from the Bu Hasa field, one of the largest onshore oil fields in Abu Dhabi, UAE. This project is pivotal in supporting ADNOC’s long-term production targets and ensuring the UAE’s energy security.
Key Highlights:
- Production Capacity Expansion: The project aims to increase oil production capacity to 650,000 barrels per day, contributing significantly to ADNOC’s strategic goal of boosting crude oil output while maintaining reservoir integrity.
- Advanced Infrastructure and Technology: It involves the installation of new oil gathering systems, enhanced oil recovery (EOR) facilities, and the modernization of existing production infrastructure to optimize operational efficiency and safety.
- Enhanced Oil Recovery (EOR) Techniques: The project utilizes water injection and gas lift systems to maintain reservoir pressure and maximize hydrocarbon recovery, ensuring long-term production sustainability.
- Environmental Sustainability: ADNOC is committed to sustainable development, integrating state-of-the-art emission control systems and water management practices to minimize environmental impact.
The Bu Hasa Integrated Field Development Project underscores ADNOC’s strategic vision of leveraging advanced technology and sustainable practices to enhance energy production while maintaining the highest standards of safety and environmental stewardship.